This dam is located near the mouth of Kelly Dam on section 4 in Bucephalia Township. The dam was constructed with WPA labor. It was 400 feet long and backed up approximately 236 acres of water. A crew of 12-14 men from the Bordulac and Melville areas worked on the project.
Source: A History of Foster County 1983 Page 18